High quality high-rise building construction climbing frame system in China factory

Company ProfileProduct Description1. Our main product: Attached Safety protection platform for lifting operation For building construction (All-steel attached lifting scaffold) Set up a certain height and attached to the structure of the building structure, relying on its own lifting equipment and devices, can climb or desc

Featured Products

Company Profile

China Factory High Quality High-Rise Building Construction Climbing Scaffolding System

China Factory High Quality High-Rise Building Construction Climbing Scaffolding System
China Factory High Quality High-Rise Building Construction Climbing Scaffolding System

Product Description
1. Our main product:

Attached Safety protection platform for lifting operation For building construction (All-steel attached lifting scaffold)
 
Set up a certain height and attached to the structure of the building structure, relying on its own lifting equipment and
devices, can climb or descend with the building structure layer by layer, with safety protection, anti-tilting, anti-falling and
synchronous lifting functions. It is composed of platform structure, lifting mechanism, power equipment, anti-tilting device,
anti-falling device and lifting synchronization control system.
 
China Factory High Quality High-Rise Building Construction Climbing Scaffolding System
 
China Factory High Quality High-Rise Building Construction Climbing Scaffolding System
Product Parameters

 

Product Name:Intelligent full steel modular attached type lifting scaffold  Linear(Horizontal)span:≤7m
Scaffolding Part Type:Scaffolding FramesBroken line or curve span:≤5.4m
Move Method:Attached Lifting ScaffoldingHorizontal Cantilever plate length:≤2m and no more than 1/2 span 
Construction Properties:Building ScaffoldFrame full height *support span:≤110
Application:High-rise/High Altitude building construction/Formworking supportingLifting Speed:12cm/Min
Certification:ISO9001,SGSAnti-falling breaking distance:≤ 80mm
Structural Style:IntegratedSynchronization error of adjacent positions:≤ 30mm
Colour:Different colour available Working load:≤ 2.0KN/, 3 floors & ≤ 3.0KN/, 2 floors
Surface Treatment:PaintedLifting load:≤ 0.5KN/, 2 floors
Supporting Mode:Wall climbing/ Hanging/ Attaching ScaffoldingRate power of hoist:500W
Specification:customizedRate load of hoist:7.5T
Distance from wall:30cmScreen windshield coefficient:0.42
Climbing Scaffolding Unit Height: ≤15m(no more than 5 floors)  
Climbing Scaffolding Unit Width:0.7m   
Our Advantages

Compare with the Cantilever steel pipe scaffolding,our steel attached lifting scaffolding have the advantage as follows:
 
1. More safety
 
The all-steel protection has high impact resistance and bearing capacity to prevent falling objects from high altitude during
construction;The all-steel frame design eliminates fire safety hazards;The overall time for tapping and dismantling is short,
which greatly reduces the falling incidents of people and objects in the process of tapping and dismantling.
The above points have greatly reduced the casualties at the construction site, reflected the people-oriented and
harmonious spirit, and reduced the company's safety management risks.

China Factory High Quality High-Rise Building Construction Climbing Scaffolding System

 
2.Fast progress:
 
It can guarantee the construction progress of one floor at the fastest 2.5 days, greatly improving the construction progress.
 
3.Exterior:
 
The components are horizontal and vertical, neat and uniform, and can be sprayed with LOGO and banners according to
customer needs. The colors are bright and durable, which enhances the construction image of the general contractor.


 
 
Packaging & Shipping

Packing:   Bundle, Package Box, Pallet, Container

Delivery Details: Generally it is 5-30 days, it is according to quantity.

Port:  
Foshan, China

China Factory High Quality High-Rise Building Construction Climbing Scaffolding System
 
Our Factory
 
China Factory High Quality High-Rise Building Construction Climbing Scaffolding System
China Factory High Quality High-Rise Building Construction Climbing Scaffolding System
 
China Factory High Quality High-Rise Building Construction Climbing Scaffolding System
China Factory High Quality High-Rise Building Construction Climbing Scaffolding System

 
 
Project Cases

 

China Factory High Quality High-Rise Building Construction Climbing Scaffolding System


 
FAQ
 
1. Q: Are you a trading company or manufacturer?
    A: We are a factory

2. Q: How long is your delivery time?
    A: The delivery time is within 5-45 days after receiving the deposit, please contact us for more details

3. Q: What is your terms of payment?
    A: 30% T/T in advance + 70% balance before shipment or LC at sight

4. Q: Is your product only sold as a whole?
    A: No, we also sell it in parts

5. Q: What is your main market?
    A.:Our main markets are the Domestic Market, Middle East, Southeast Asia, Africa, Europe, etc.

6. Q: What is your MOQ?
    A: 1 Set per time if out of stock. There is nothing requirement for our stock available.

7. Q. Can you provide a special customized solution for us?
    A. Sure, customized service is available, that is one of our business. Please let us know your idea

8. Q: Can we visit your factory?
    A: Sure, feel free to contact us before your visit. The address is No.576, Gongye Ave, Tingbu Village, Genghe Town, Gaoming District, Foshan City, Guangdong, China
 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours